Supplying Critical Water for Haitian Hospital

project picture

Updates from the Field:

Updates from the Field (or Progress Reports) on GlobalGiving are posted directly to globalgiving.com by Project Leaders as they are completed, generally every 3-4 months. To protect the integrity of these documents, GlobalGiving does not alter them; therefore you may find some language or formatting issues.

Keep Up-to-Date

Subscribe to "Updates from the Field" by E-Mail
Subscribe to "Updates from the Field" by RSS Feed

Update from Haiti

By Hugh Tozer - Project leader, December 20, 2007 06:48 PM

Please click the reports below to read about the water main installation in June 2007 and also future plans for this project including improving the existing well, constructing a new well, improving piping, distribution, and sanitation!
Attachments:

Was this report valuable...
vote divider
Loading...
Tell us why (your comments may be shared publicly).
Rules for Comments 
Comments

Water Main and Well Controls

By Hugh Tozer - Project Manager, March 14, 2007 05:35 PM

New water main and a well control system are due to arrive in Haiti in March 2007. The main will replace the existing pipe, which runs through a medical waste pipe. The new pipe should eliminate this contamination.

The pump controls will replace the existing system, which requires the operator to manual restart the pump whenever there is a power loss. Cap Haitien has suffered with irregular power, typically having less than 8 hours in the night. If the operator did not return to the hospital to restart the pump, there was no water. The new controls will run the pump whenever there is power and the switch is on.

This work should be completed by June 2007.